Klíma Kapu Riasztó

Klíma Kapu Riasztó

megold

Klíma Kapu Riasztó

megold



FVR-C11S-EN

Contents

Safety Instructions

 

 

................................... 1

1 Before Using This Product

 

 

........... 1-1

1-1 Receiving Inspections ................... 1-1

1-2 Appearance .................................. 1-2

1-3 Handling the Product .................... 1-3

1-4 Carrying ........................................ 1-4

1-5 Storage and transportation ........... 1-4

2 Installation and Connection

 

 

........... 2-1

2-1 Operating Environment ................. 2-1

2-2 Installation Method ........................ 2-2

2-3 Connection .................................... 2-3

2-3-1 Basic connection .................... 2-3

2-3-2 Connecting the main circuit

and ground terminals ............. 2-4

2-3-3 Connecting the

control terminals ..................... 2-6

2-3-4 Connection examples ........... 2-12

2-4 Others ......................................... 2-21

2-4-1 Harmonic component ........... 2-21

2-4-2 Noise .................................... 2-21

2-4-3 Leakage current ................... 2-21

3 Operation

 

 

............................................ 3-1

3-1 Inspection and Preparation

before Operation ........................... 3-1

3-2 Operation Method ......................... 3-1

3-3 Trial Run ....................................... 3-2

4 Keypad Panel

 

 

.................................... 4-1

4-1 Names and Functions ................... 4-1

4-2 Operating Keypad Panel ............... 4-1

5 Selecting Function

 

 

........................... 5-1

5-1 Function Selection List .................. 5-1

5-2 Details of Each Function ............... 5-7

6 Protective Function

 

 

......................... 6-1

6-1 List of protective functions ............ 6-1

6-2 Alarm Reset .................................. 6-3

7 Troubleshooting

 

 

............................... 7-1

7-1 In case of tripping ......................... 7-1

7-2 Other trouble ................................. 7-7

8 Maintenance and Inspection

 

 

.......... 8-1

8-1 Daily Inspection ............................. 8-1

8-2 Periodic Inspection ........................ 8-1

8-3 Electrical measurements

in the Main Circuit ......................... 8-5

8-4 Insulation Test ............................... 8-6

8-5 Parts Replacement ....................... 8-7

8-6 Inquiries about the Product and

Guarantee of the product .............. 8-7

9 Specifications

 

 

.................................... 9-1

9-1 Standard Specifications ................ 9-1

9-2 Common Specifications ................ 9-2

9-3 Dimensions ................................... 9-8

9-4 Selection of Peripheral Device .... 9-11

10 Options

 

 

............................................ 10-1

10-1 Built-in Options ............................ 10-1

10-2 External Options ......................... 10-1

11 Applicable reactors

 

 

....................... 11-1

12 Compliance with standards

 

 

........ 12-1

12-1 UL/cUL standards [Applicable to

products with UL/cUL mark]......... 12-1

12-1-1 General ................................. 12-1

12-1-2 Precautions ........................... 12-1

12-2 Compliance with EMC directive

in EU [Applicable to products

with CE mark] .............................. 12-2

12-2-1 General ................................ 12-2

12-3 Compliance with low voltage directive

in EU [Applicable to products

with TÜV or CE mark] .................. 12-2

12-3-1 General ................................. 12-2

12-3-2 Precautions ........................... 12-2

13 Electromagnetic

Compatibility (EMC)

 

 

....................... 13-1

13-1 General ....................................... 13-1

13-2 RFI Filters ................................... 13-1

13-3 Recommended Installation

Instructions .................................. 13-3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FVR-C11S-EN

Contents

Safety Instructions

 

 

................................... 1

1 Before Using This Product

 

 

........... 1-1

1-1 Receiving Inspections ................... 1-1

1-2 Appearance .................................. 1-2

1-3 Handling the Product .................... 1-3

1-4 Carrying ........................................ 1-4

1-5 Storage and transportation ........... 1-4

2 Installation and Connection

 

 

........... 2-1

2-1 Operating Environment ................. 2-1

2-2 Installation Method ........................ 2-2

2-3 Connection .................................... 2-3

2-3-1 Basic connection .................... 2-3

2-3-2 Connecting the main circuit

and ground terminals ............. 2-4

2-3-3 Connecting the

control terminals ..................... 2-6

2-3-4 Connection examples ........... 2-12

2-4 Others ......................................... 2-21

2-4-1 Harmonic component ........... 2-21

2-4-2 Noise .................................... 2-21

2-4-3 Leakage current ................... 2-21

3 Operation

 

 

............................................ 3-1

3-1 Inspection and Preparation

before Operation ........................... 3-1

3-2 Operation Method ......................... 3-1

3-3 Trial Run ....................................... 3-2

4 Keypad Panel

 

 

.................................... 4-1

4-1 Names and Functions ................... 4-1

4-2 Operating Keypad Panel ............... 4-1

5 Selecting Function

 

 

........................... 5-1

5-1 Function Selection List .................. 5-1

5-2 Details of Each Function ............... 5-7

6 Protective Function

 

 

......................... 6-1

6-1 List of protective functions ............ 6-1

6-2 Alarm Reset .................................. 6-3

7 Troubleshooting

 

 

............................... 7-1

7-1 In case of tripping ......................... 7-1

7-2 Other trouble ................................. 7-7

8 Maintenance and Inspection

 

 

.......... 8-1

8-1 Daily Inspection ............................. 8-1

8-2 Periodic Inspection ........................ 8-1

8-3 Electrical measurements

in the Main Circuit ......................... 8-5

8-4 Insulation Test ............................... 8-6

8-5 Parts Replacement ....................... 8-7

8-6 Inquiries about the Product and

Guarantee of the product .............. 8-7

9 Specifications

 

 

.................................... 9-1

9-1 Standard Specifications ................ 9-1

9-2 Common Specifications ................ 9-2

9-3 Dimensions ................................... 9-8

9-4 Selection of Peripheral Device .... 9-11

10 Options

 

 

............................................ 10-1

10-1 Built-in Options ............................ 10-1

10-2 External Options ......................... 10-1

11 Applicable reactors

 

 

....................... 11-1

12 Compliance with standards

 

 

........ 12-1

12-1 UL/cUL standards [Applicable to

products with UL/cUL mark]......... 12-1

12-1-1 General ................................. 12-1

12-1-2 Precautions ........................... 12-1

12-2 Compliance with EMC directive

in EU [Applicable to products

with CE mark] .............................. 12-2

12-2-1 General ................................ 12-2

12-3 Compliance with low voltage directive

in EU [Applicable to products

with TÜV or CE mark] .................. 12-2

12-3-1 General ................................. 12-2

12-3-2 Precautions ........................... 12-2

13 Electromagnetic

Compatibility (EMC)

 

 

....................... 13-1

13-1 General ....................................... 13-1

13-2 RFI Filters ................................... 13-1

13-3 Recommended Installation

Instructions .................................. 13-3

 

 

2 Safety Instructions

FVR-C11S-EN

Compliance with UL/cUL standards [Applicable to products with UL/cUL mark]

1. [WARNING] Take care of electric shock. Be sure to turn the

inverter off before starting work.

2. [CAUTION] When the charge lamp is lit, the inverter is still charged

at a dangerous voltage.

3. [WARNING] There are two or more live parts inside the inverter.

4. The inverter is approved as a part used inside a panel. Install it inside

a panel.

5. Perform wiring to the input, output and control terminals of the inverter,

referring to the table below. Use UL certified round crimp

terminal to the input and output terminals with insulation cover or

covered with reduced tube to obtain the insulation distance. Use a

crimping tool recommended by the terminal manufacturer when

fabricating crimp terminals.

6. Install a fuse in the power supply to the inverter, referring to the table

below.

Voltage Inverter type

Tightening torque

[Nm]

Applicable wire diameter

[AWG] (mm

 

 

2)1)

Fuse

[A]

 

 

2)

Recommended fuse

L1/L, L2/N

U, V, W

Control

section

L1/L, L2/N

U, V, W

Control

section

Gould

Company

Bussmann

Company

Singlephase

200V

input

FVR0. 1C11S-7EN

1.2

0.4

14 (2.1)

20 (0.5)

6 A4J6 JKS6

FVR0. 2C11S-7EN 6 A4J6 JKS6

FVR0. 4C11S-7EN 10 A4J10 JKS10

FVR0. 75C11S-7EN 15 A4J15 JKS15

FVR1. 5C11S-7EN 12 (3.3) 30 A4J30 JKS30

FVR2. 2C11S-7EN 1.8 10 (5.3) 40 A4J40 JKS40

1) Use copper wires of allowable maximum temperature 60 or75 °C.

2) Use UL certified "quick breaking fuse".

7. Connect the power supply satisfying the characteristics shown in

the table below as an input power supply of the inverter. (Short

circuit rating)

Inverter type Input max. voltage Input current

FVR0. 1-2. 2C11S-7EN AC240V 5,000 A or less

CAUTION

 

 

Safety Instructions 3

FVR-C11S-EN

Compliance with low voltage directive in

EU [Applicable to products with TÜV

mark]

CAUTION

1. Safe separation for control interface of this

inverter is provided when this inverter is installed

in overvoltage category II. PELV

(Protective Extra Low Voltage) circuit or

SELV (Safety Extra Low Voltage) circuit

from external controller is connected to the

interface directly.

2. Basic insulation for control interface of this

inverter is provided when this inverter is installed

in overvoltage category III. An insulation

transformer has to be installed

between power supply mains and this inverter

when SELV circuit from external

controller is connected to this inverter directly.

Otherwise supplementary insulation

between control interface of this inverter

and environment must be provided.

3. The ground terminal G should always be

connected to the ground. Don’t use only

RCD as the sole method of electric shock

protection. Dimensions of external PE conductor

should be same as dimensions of

input phase conductor and capable for

possible fault.

4. Use MCCB or MC that conforms to EN or

IEC standard.

5. Where RCD (Residual-current-operated

protective device) is used for protection in

case of direct or indirect contact, only

 

 

RCD

of type B

 

 

is allowed on the supply side of

this EE (Electric equipment). Otherwise another

protective measure shall be applied

such as separation of the EE from the environment

by double or reinforced insulation

or isolation of EE and supply system

by the transformer.

6. The inverter has to be installed in environment

of pollution degree 2. If the environment

is pollution degree 3 or 4, the

inverter has to be installed in a cabinet of

IP54 or higher.

7. Use a prescribed wire according to the

EN60204 Appendix C.

8. Install the inverter, AC or DC reactor, output

filter in an enclosure that meets the

following requirement, to prevent a human

body from touching directly to these

equipment.

1) When a person can touch easily on each

connecting terminal or live parts, install

the inverter, AC or DC reactor, output filter

in an enclosure with minimum degree

of protection of IP4X.

2) When a person can not touch easily on

each connecting terminal or live parts,

install the inverter, AC or DC reactor,

output filter in an enclosure with a minimum

degree of protection of IP2X.

9. It is necessary to install the inverter in appropriate

method using an appropriate

RFI filter to conform to the EMC directive.

It is customer’s responsibility to check

whether the equipment, the inverter is installed

in, conforms to EMC directive.

4 Safety Instructions

 

 

 

 

 

 

 

 

 

 

 

 

FVR-C11S-EN

Compliance with low voltage directive in EU [Continued]

Use of wires specified in Appendix C of EN 60204 is recommended.

Power

supply

voltage

Nominal

applied

motor

[kW]

Inverter type

Molded case circuit

breaker (MCCB) or

earth leakage

circuit breaker

(ELCB)

 

 

1)

Rated current [A]

Recommended wire size [mm

 

 

2

]

Input circuit

 

 

2)

single phase

200V [L1/L, L2/N]

Output

circuit

 

 

2)

[U, V, W]

DCR

 

 

2)

circuit

[P1]

[P(+)]

Control

wiring

With

DCR

Without

reactor

 

 

3)

With

DCR

Without

reactor

 

 

3)

Single

phase

200V

0.1 FVR0. 1C11S-7EN

6

6

2.5

 

 

4)

2.5

 

 

4)

2.5

 

 

4) 2.5

4)

0.5

0.2 FVR0. 2C11S-7EN

0.4 FVR0. 4C11S-7EN 10

0.75 FVR0. 75C11S-7EN 10 16

1.5 FVR1. 5C11S-7EN 16 20

 

 

4.0

4)

2.2 FVR2. 2C11S-7EN 20 32

 

 

4.0 5) 6.0 5) 2.5 5) 4.0

5)

1) The applicable frame and series of the molded case circuit breaker (MCCB) and

earth leakage circuit breaker (ELCB) vary according to the capacity of the

transformer of the equipment. For details of selection, refer to the concerning

technical documents.

2) The recommended wire size for the main circuit is the case for the low voltage

directive at ambient temperature 40 °C.

3) The power supply impedance without a reactor is considered to be the

equivalent of 0.1% of the inverter capacity, with 10% current imbalance

accompanied by the voltage imbalance.

4) Crimp terminals up to 7.4 mm in width (including tolerance) can be used.

5) Crimp terminals up to 9.5 mm in width (including tolerance) can be used.

6) Use the grounding cable of a size equal to or larger than that of the input power

supply cable.

CAUTION